DC Water: 3-hour pre-dawn drone survey of about 850 ft of a 9 ft wastewater force main

DC Water had a pre-construction survey of a wastewater force main that failed in 2025 flown with a LiDAR drone. About 850 ft of 9 ft pipe was mapped in a roughly 3-hour pre-dawn window without anyone entering. No cost comparison is given and the length is stated inconsistently.

OwnerDC Water (Anacostia Force Main)
ProviderGedeon GRC Consulting (for contractor Spiniello Companies)
LocationWashington, DC, United States
AircraftFlyability Elios 3 with LiDAR payload and range extender
SensorsLiDAR, 4K video, 12 MP stills

Before

Confined-space entry, power washing and CCTV, which would have required a full temporary shutdown of a main with few diversion options.

With drones

After a July 2025 failure and repair, a pre-construction survey was flown from a 23-inch manhole during a 2–5 a.m. low-flow lock-out window.

Outcomes

MetricValueBasis
survey timeabout 850 linear ft mapped in about 3 hoursReported
safetyno confined-space entry for field crewsReported
shutdownno full shutdown; work fitted into a low-flow windowReported
Caveats & limits
  • Manufacturer case study; length is given variously as 800+, 850 and 900 ft, and the meta description wrongly says Brooklyn.
  • The 3-hour window left little margin; year inferred from the dated failure and repair.
  • No cost comparison is given.